Cloud Service >> Knowledgebase >> How To >> How Reliable Is Power and Cooling in Jaipur Colocation Facilities?
submit query

Cut Hosting Costs! Submit Query Today!

How Reliable Is Power and Cooling in Jaipur Colocation Facilities?

Cyfuture Cloud's Jaipur colocation facilities deliver Tier-III level reliability for power and cooling, featuring redundant systems that achieve 99.99% uptime. These setups include backup generators, UPS units, and advanced cooling infrastructure tailored for high-density workloads like GPU servers.​

Power reliability exceeds 99.99% with N+1 redundancy, dual power feeds, and diesel generators ensuring zero downtime during outages. Cooling maintains optimal temperatures via precision air conditioning and liquid cooling options, supporting up to 4kW per rack for AI and hybrid cloud needs in Jaipur's climate.​

Power Infrastructure Details

Jaipur colocation centers, including Cyfuture Cloud's Sitapura IT Park facility, employ Tier-III certified power systems with multiple redundancies. Facilities provide 2-4kW per rack, backed by uninterruptible power supplies (UPS) and on-site diesel generators that activate within seconds of grid failure. This setup prevents disruptions even during Rajasthan's occasional summer grid strains, maintaining continuous operation for mission-critical applications.​

Redundant A/B power feeds ensure no single point of failure, with automatic failover capabilities. Cyfuture Cloud integrates these with hybrid cloud connectivity, allowing seamless bursting to Delhi or Mumbai sites during rare extended outages. Power usage effectiveness (PUE) remains efficient due to regional energy advantages, often 20-30% lower costs than Mumbai facilities.​

Cooling System Reliability

Cooling in Jaipur facilities combats high ambient temperatures with precision air conditioners (PAC) and innovative options like liquid cooling for high-TDP GPUs. Cyfuture Cloud's design includes hot/cold aisle containment, achieving precise temperature control within ASHRAE guidelines (18-27°C). Redundant CRAC units and economizers optimize energy use while ensuring 99.95% availability.​

For AI workloads, liquid cooling handles dense GPU clusters (e.g., H100 equivalents), reducing thermal throttling and extending hardware life. Jaipur's lower humidity compared to coastal cities aids efficiency, with facilities monitoring via 24/7 BMS systems for proactive adjustments. Backup chillers prevent failures during peak summer loads.​

Jaipur-Specific Advantages

Jaipur's strategic location in Sitapura IT Park offers stable power from Rajasthan's renewable-heavy grid, supplemented by Cyfuture Cloud's robust backups. Facilities achieve ISO 27001 security alongside environmental controls, ideal for data sovereignty. Proximity cuts latency for northern India users while providing cost-effective operations versus Delhi.​

Cyfuture Cloud emphasizes scalability, with remote hands support for quick interventions. This reliability supports fintech, healthcare, and AI firms needing uninterrupted hybrid setups.​

Industry Standards and Metrics

Aspect

Cyfuture Cloud Jaipur

Tier-III Benchmark

Notes

Uptime

99.99%

99.982%

Annual downtime <53 min ​

Power Redundancy

N+1 UPS/Generators

N+1

Dual feeds, auto-failover ​

Cooling PUE

~1.4-1.6

<1.5 ideal

Liquid cooling for GPUs ​

Rack Density

2-4kW+

3-5kW

GPU-optimized ​

 

These metrics position Cyfuture Cloud as a leader in regional colocation.​

Conclusion

Cyfuture Cloud's Jaipur colocation excels in power and cooling reliability through Tier-III redundancies, advanced tech, and location benefits, guaranteeing enterprise-grade performance. Businesses achieve cost savings and scalability without compromising uptime, making it ideal for India's growing digital demands.​

Follow-Up Questions

Q: What uptime SLA does Cyfuture Cloud guarantee in Jaipur?
A: 99.99% uptime SLA, backed by Tier-III certification and geo-redundant options to Delhi/Mumbai.​

Q: How does Jaipur handle summer power grid issues?
A: On-site generators and UPS cover outages, with hybrid cloud bursting for extended resilience; RTO under 15 minutes.​

Q: Are liquid cooling options available for GPUs?
A: Yes, integrated for high-density AI workloads, supporting CUDA and reducing latency via private interconnects.​

Q: What are power costs compared to Mumbai?
A: 20-30% lower due to regional efficiencies and renewables, with pay-per-use flexibility.​

Q: Is the facility compliant for Indian data regulations?
A: Fully MeitY-empanelled, ISO 27001 certified, ensuring sovereignty and security.​

Cut Hosting Costs! Submit Query Today!

Grow With Us

Let’s talk about the future, and make it happen!